EMC^2/Legato Net­work­er 7.5.1.6 status

We updat­ed Net­work­er 7.5.1.4 to 7.5.1.6 as the Networker-Support thought it will fix at least one of our prob­lems (“ghost” vol­umes in the DB). Unfor­tu­nate­ly the update does not fix any bug we see in our environment.

Spe­cial­ly for the “post-command runs 1 minute after pre-command even if the back­up is not finished”-bug this is not sat­is­fy­ing: no con­sis­tent DB back­up where the appli­ca­tion has to be stopped togeth­er with the DB to get a con­sis­tent snap­shot (FS+DB in sync).